Sponsored Research Projects
- Compilers for Indigeneous Microprocessor; CDAC; 350 lacs;
4 years; Submitted in May 2015; Co-PI to engineer the many-core architectural
features of the hardware for generation of target code;
Status : Approval awaited.
- Compilers for Multicore Architectures; MIT (GoI); 133 lacs;
3 years; Submitted in Nov 2014; Principal Investigator
(PI); Conduct Research in the area of Parallelizing Compilers; Status : Approval
awaited.
- Railway Scheduling and Pricing ; Tata Consultancy Services, Mumbai;
81.3 Lacs; 2014-2016; Co-PI; PI for one project dealing with design of a
controller that dynamically allocates and schedules collection of processes;
status : Ongoing.
- GCC Resource Centre; Ministry of IT; 99 lacs; 2009-2015;
Co-PI involved with the vectorization and parallelization efforts in GCC;
Status : completed recently.
- Parallel Computing Research; Intel Corporation, Bangalore;
10 Lacs; 2011-2013; PI involved with defining parallel computing research
problems for Intel h/w; Status : Completed.
- Improving GCC ports of ABACUS and ANUPAMA; DRDO Hyderabad;
5 Lacs; 2009 - 2012; PI involved with overall design of the s/w;
Status : Completed.
- Parallel Extentions to C for UMS architecture;
Cradle Technologies, Pune; 1.3 Lacs; 2002 (one year);
Sole PI for the design and implementation for the projecti;
Status : Completed.
- Code Partitioner for DSP programs;
Silicon Automation Systems, Bangalore; ??; ?? ;
PI involved with formulation of analysis for DSP programs;
Status : Completed.
- Emulator Generator Silicon Automation Systems, Bangalore;
??? ; ??? ; Co-PI involved with the design of the tool
Status : Completed.
- Manpower Development in Electronics and Computers ;
World Bank and DOE (GoI); 150 lacs; 1990-1995;
One of the 3 authors for lecture / slides and handbook for course on Compiler
Construction; Status : Completed.
- Design of MACH Multiprocessor OS;
Group of Industries – Godrej, CDAC, Crompton Greaves; 10 Lacs; 1989-1991;
Co-PI to Re-engineer the modules of OS dealing with concurrency;
Status : Completed.
- Translator for COBOL to RDBMS ; Associated Cement Company;
8 Lacs; 1993-1994; Co-PI involved with the design of a parser and slicer
for COBOL programs; Status : Completed.
- Expert System for Computer Aided Process Planning (CAPP);
DOE (GoI); 12.45 Lacs; 1990-1994; Co-PI involved with the data structure
and system design for CAPP; Status : Completed.
- Sequential Fortran to Parallel Fortran Translator for PARAM ;
CDAC Bangalore; 5 Lacs; 1990-1992; Co-PI in charge of the design and
implementation of the parallelization tool; Status : Completed.
- Optimizing Fortran Compiler ; DOE (GoI); 7.9 Lacs; 1985-1991;
PI during 86-88 and Co-PI otherwise - involved with the design of front end and
local optimizer. Status : Completed.
- IDEAS : A Tool for VLSI – CAD : Phase 1 and 2 ;
DOE (GoI); 25 Lacs; 1988-1996; Large Inter-institutional large project
involving IITB, IITD and SCIL. Co-PI involved with developing syntax directed
editor for h/w language IDEAL; Status : Completed.
- VLSI Design Centre DOE (GoI); 73.27 Lacs; 1987-1992;
Co-PI involved with development of software for circuit simulation;
Status : Completed.